Paint Booth

The permit-by-rule is a permitting option specifically for spray booths, facilities in compliance with these requirements are deemed in compliance with air construction permitting requirements.

Note: Permit-by-rule does not exempt the pollution source from applicable air pollution regulations and compliance requirements.

One Gallon Permit-by-Rule

If your facility never sprays more than one gallon of sprayable material in any single day (not average) you can use the one gallon permit-by-rule and be in compliance with Iowa construction permit requirements for spray operations.

Download One Gallon Permit-by-Rule Regulation Information on the right

Three Gallon Permit-by-Rule

If your facility never sprays more than three gallons of sprayable material in any single day (not average) you can use the three-gallon permit-by-rule and be in compliance with Iowa construction permit requirements for spray operations.

Download Three Gallon Permit-by-Rule Regulatory Information on the right


Form

  • DNR Notification Letter for Permit by Rule for Spray Booths - Form 542-005 (DOC) / (PDF)

 

Documents

  • One Gallon Permit-by-Rule Regulation Information (PDF)
  • Three Gallon Permit-by-Rule Regulation Information (PDF)

 

Recordkeeping

  • One and Three Gallon Permit by Rule Daily Log (DOC)
  • 12 Month Rolling Log Sheet (DOC)
  • 12 Month Rolling Usage Calculator (EXCEL)